Skip To Main Content
Eagle Gold Mine – Victoria Gold
Location: Mayo, Yukon Territories
Building Type: Industrial
Project Completed: 2021
Building System: Rigid Frame Steel Buildings
Special Size: 14,100 sq. ft.
Special Features:
- The featured truck shop, with a wash bay, has five 26 ft X 23 ft doors and a 20 tonne crane.
- Main building dimensions: 66′ x 186′ x 56′
- Additional building dimensions: 24′ x 77′ x 25′
- Finished with Artspan Insulated Metal Panels in Regal Blue
Other Industrial Projects